December 2016. Gas detection and air quality control in road tunnel.
These tunnels are part of the first stage of the project for a connection viaduct between Interlomas and the new Naucalpan-Toluca highway. The construction of the viaduct is composed of three stages. The first is the construction of two twin tunnels, one 575 meters long and the other 124, both including two sections of 2 lanes in each direction and a minimum gauge of 5,5 meters.
This project intends to connect three points to facilitate vehicular traffic in the area in both directions as an alternative to Mexico City and Interlomas, from Palma Criolla and Palma de Dátil avenues up to the Chamapa-La Venta highway and the new Naucalpan-Toluca highway.
For the gas detection systems in this tunnel, the DURTOX gas detection system, designed and manufactured by DURÁN ELECTRÓNICA, has been chosen. Air quality control is carried out with opacimeters and anemometers distributed by DURÁN ELECTRÓNICA.