January 2011. CO detection in the new hospital of Torrejón.
In Torrejón a new hospital is being built over the area known as Soto del Henares. This new medical infrastructure includes four blocks (technical, hospitalization, consultations and installations) and incorporates innovative technological criteria for sustainability and comfort, using renewable energies and bioclimatic architecture.
This project has a budget of 139 million euros for new construction and the remodeling of an existing specialties center. It has a surface of 60,000m2 and 14,920m2 of parking space.
The underground car park will be protected by the DURAN 203 PLUS carbon monoxide detection and measurement system, designed and manufactured by DURAN ELECTRONICA.